Cast Boosters

Solarcast-P (Castbooster)

Description &
Application

Booster is made of a high explosive composition cast into a cardboard/plastic shell. Two longitudinal tunnels in the booster accommodate either a signal tube detonator or detonating cord. One tunnel has straight walls while the other is blocked at the top of the booster to provide a stop for the detonator. Detonating cord or signal tube are protected from damage by a recessed well at the base of the booster.

Cast Boosters have a high density and a high velocity of detonation (VOD) to maximize performance.Cast boosters are reliably initiated by detonators or by detonating cords containing at least 5.0 g/m PETN. These boosters have been specifically designed to provide reliable initiation of pumped, augered and packaged explosives. The main intended application for Cast boosters is for use with ANFO and Bulk explosives.

Recommendation
for use

With Delay Detonators:

Thread the detonator through the booster as shown in Figure 1. After assembly, the top and bottom faces may be taped for additional security against the detonator falling out especially in rough, angled blastholes. Lower the complete assembly to the desired location in the blasthole. Avoid walking on the signal tube or lead wires as this is likely to cause damage. In all applications, ensure that the primer is completely immersed in the explosive it is intended to initiate. This can be achieved by either pulling the primer up into the explosive or suspending the primer above the hole bottom during loading.

Large diameter packaged explosives should be lowered on top of primers, rather than dropped from the blasthole collar. The cord or tube downline should be kept taut during charging and stemming, to prevent damage and minimise abrasion. However, if a primer begins to float on top of a rising column of bulk explosive, temporarily slacken the downline. Once the surface of the explosive column has risen past the primer, tension can be reapplied to the downline.

With Detonating Cord:

Use Cast boosters with any detonating cord which has a PETN charge mass of 5.0 g/m or greater. Ensure the booster is securely attached to the detonating cord by passing the cord down through one tunnel. Tie the cord to form a loop, as shown in Figure 2, then lower the com- plete assembly to the desired location in the blasthole. Cut the detonating cord downline from its reel and adequately secure it at the blasthole collar. Charge the hole with explosives to the design level. For any subsequent boosters on the same downline, unfasten the detonating cord tail and thread the end of the cord through the straight walled tunnel. Re-secure the cord tail, at the collar, and slide or lower the booster to the desired location.

TECHNICAL DATA

PACKAGING

Export Packaging

Export Packaging

STORAGE & HANDLING
Cast boosters have a shelf life of 5 years in good storage conditions. These boosters should be stored in a cool, dry magazine licensed for 1.1D Explosives.

SHIPPING INFORMATION :
Authorised Name of Explosive : SOLARCAST-P

Proper Shipping Name : BOOSTERS, without detonator

Class / Div. : 1.1D

UN No. : 0042

Leaders in Manufacturing Explosives for Infrastructure development

Solar Nigachem Nigeria Ltd. The one stop to services for Mining operations, road construction, Quarries and more.
TOP